Moving Maputo forward

Designing a BRT system around demand, dignity and data

If you’ve ever spent time in Maputo, Mozambique, during peak hour, you’ll spot the problem quickly. If you haven’t, here’s some context: minibus taxis stop wherever there’s a passenger, informal traders operate along sidewalks and spill into the roadway, and vehicles edge forward in small increments.

Suffice to say, everyone’s trying to move, yet very little movement happens. A 22-kilometre trip from the outer zones into the CBD can take up to two hours.

That daily friction carries a cost. It affects how quickly people reach work and how safely they return home, and it shapes economic performance in ways that only become clear when you model the system.

That’s what we were asked to do when we were appointed to lead the feasibility, planning, design and tender preparation for Maputo’s Bus Rapid Transit (BRT) system.

Feasibility first
Before a single lane was drawn, we had to prove the system was needed and could sustain itself over the long term. The feasibility study went beyond identifying a transport gap and had to demonstrate financial sustainability, operational viability, and a measurable benefit for the city.

That work unlocked an approximate $200 million World Bank grant – the largest of its kind awarded to an African country – which covers implementation and electric bus procurement.

For me, it reinforced that solid technical groundwork builds confidence, and confidence unlocks investment.

The project forms part of the Government of Mozambique’s Urban Mobility Project, MOVE Maputo, launched in 2022 through the Ministry of Transport and Logistics, with a dedicated implementation team driving the BRT rollout.

Understanding what commuters value most
Transport planning can easily become infrastructure-focused. But in Maputo, the most valuable insight came directly from commuters.

Across the city, many roads and vehicles are worn, and safe, reliable transport remains out of reach for thousands. Informal minibuses, known locally as “chapas”, carry commuters daily under tough conditions, often with limited seating and little predictability.

In a stated-preference survey, we asked people what mattered most in their daily journey. The top priority wasn’t technology or speed, but a guaranteed seat. Dignity and predictability ranked high as commuters described overcrowding, discomfort and long trips in difficult conditions. (Imagine travelling to work and back for two hours, either crouched in a minibus or sitting on a stranger’s lap.)

Working within a constrained urban environment
The selected BRT corridor spans approximately 22 kilometres, linking Zimpeto, Zona Verde, Albazine, Praça da Juventude, Praça dos Combatentes and the Maputo CBD, with a connection to the Praça dos Trabalhadores rail station.

A 16 km segregated BRT section will connect Baixa da Cidade to Missão Roque, while 13 km of mixed-use lanes extend toward Albazine and Zimpeto.

Corridor selection balanced commuter density, spatial feasibility and minimal displacement in line with World Bank safeguards.

From an engineering perspective, the CBD presented real complexity. Much of the underground infrastructure dates back to the colonial era, with limited documentation and ageing stormwater systems. This meant conducting detailed surveys and redesigning drainage before lane allocation could begin.

Designing mobility within a living city
When you start redesigning a corridor like this, you quickly realise it’s not only about drawing a new lane on a plan. Because the BRT runs in the centre of the road, every intersection had to be reconsidered.

For example, we removed right-turn conflicts and redirected traffic through controlled turns, allowing buses to move without constant interruptions. Signal systems were upgraded at the same time, so the entire corridor functions as a single coordinated system rather than a series of disconnected junctions.

We also integrated technology from the start. Fares are cashless, buses are tracked in real time, and traffic signals respond to the network, which helps keep the system predictable. Even the buses are electric and can charge overnight at a depot or top-up at fast-charging points at either end of the route to keep services running throughout the day.

The upfront cost is higher, but the operating and maintenance efficiencies support the long-term model.

Along the route, 10 modern terminals are planned to move up to 4,000 passengers per hour in each direction, carrying an estimated 40 million passengers annually. The system is expected to serve approximately 400,000 passengers daily, while nearly one million residents will benefit from associated road and accessibility upgrades.

Feeder roads are also being rehabilitated and constructed to connect surrounding communities, including Matola and Marracuene, to key terminals in Albazine and Zimpeto.

Partnership and delivery
One of the most positive aspects of this project has been collaborating with Mozambique’s Ministry of Transport and Communications and the dedicated MOVE Maputo project management unit. Decision-making was clear and focused, and technical discussions remained constructive.

My takeaway? Urban mobility projects succeed when they reflect local realities. Maputo’s BRT is designed for the city as it functions today, while preparing it for future growth.

Transport systems shape how cities move, connect and work. When the fundamentals are done properly, the benefits extend far beyond the roadway.

Read the Project Story here