Skip to content
Engineering at 2,874m

Altis Biologics Bone Processing Facility

Altis Biologics manufactures artificial, injectable bone paste derived from suidae (pig) bone, which is used to repair human fractures during surgery.

To meet strict production and sterility standards, it needed a facility as advanced as the manufacturing process itself.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Engineering at 2,874m

Altis Biologics Bone Processing Facility

Altis Biologics manufactures artificial, injectable bone paste derived from suidae (pig) bone, which is used to repair human fractures during surgery.

To meet strict production and sterility standards, it needed a facility as advanced as the manufacturing process itself.

PROJECT INFORMATION

Client:Altis Biologics
Main contractor: 
JV partners 
Date: 
Location:Pretoria, South Africa
Challenge:Designing a facility that processes animal tissue for human bone repairs without compromising on GMP, ISO or biosafety standards.
Solution:A dual-zoned formulation facility tailored to Altis Biologics’ patented bone paste process, with sterile, zoned workspaces and technical systems
Impact:Enabled up-to-standard production of advanced bone repair materials used to repair human fractures

PROBLEMS WE SOLVED

Designing for sterility and precision

In 2018 Altis Biologics contracted Atana to design a high-performance plant at the Innovation Hub in Pretoria; one that could safely handle both animal tissue and the final product.

Atana’s challenge? Create a fully integrated, dual-zoned facility to manage complex workflows – from DNA extraction and milling to sterile drying, chromatography, and sterile precision syringe filling. All systems had to meet international ISO classifications and maintain end-to-end biosafety.

A fit-for-science facility

  • Zoned workspaces: Separate “dirty” and “clean” areas with dedicated pathways, pressure cascades, and operator workflows
  • ISO-approved cleanroom: ISO 8 cleanrooms for processing and a class B ISO 7 syringe-filling suite for the final product
  • HVAC for airflow control: A GMP-aligned heating, ventilation, and air conditioning (HVAC) system to maintain stable airflow, cascading air pressure levels, and environmental control
  • Chemical-resistant finishes: Smooth, water-impervious, chemical-resistant surfaces and infrastructure
  • Coordinated BIM: Building information modelling (BIM)-aligned services, systems and spatial planning across all phases
  • Safe, efficient operating areas: Laboratory furniture and technical equipment tailored and placed for protection and efficiency

Altis Biologics’ new facility now supports:

  • Production of injectable bone paste at global sterility standards;
  • Efficient processing of organic material for surgical use;
  • Expansion of South Africa’s local biotech manufacturing capabilities; and
  • A safer, better-controlled environment for staff.

Leading the way in local biotech

With this facility, Altis Biologics can produce regenerative surgical materials at scale, significantly strengthening South Africa’s standing in global biotech.

PROBLEMS WE’VE SOLVED: Sani Pass Upgrade Sani Pass (P318) is a lifeline for trade and tourism, linking South Africa and Lesotho through one of the region’s most challenging and scenic routes.



As the only road that crosses the summit of the Drakensberg Mountain range, Sani Pass’s steep switchbacks, loose gravel, and sudden weather changes meant local communities faced dangerous journeys to access schools, healthcare, and trade routes.
Find out more 01 / 10 > <
PROBLEMS WE’VE SOLVED: Altis Biologics Bone Processing Facility The future use of the campus had to be re-examined because of the growth in the number of students at Erasmus University Rotterdam (EUR), different ways of working together and the integration of new activities on campus such as startups, culture, sports and living. Find out more 02 / 10 > < PROBLEMS WE’VE SOLVED: Brandwacht Pedestrian Bridge Tucked along the scenic R328 between Mossel Bay and Oudtshoorn, Brandwacht is a small town on one of the Garden Route’s busiest stretches. Find out more 03 / 10 > < PROBLEMS WE’VE SOLVED: Mountain View Project Story
Mountain View is a high-density housing development on the outskirts of Mossel Bay. It offers over 1,000 erven for low-income families in the region. Find out more 04 / 10 > <
PROBLEMS WE’VE SOLVED: Welgedacht Wastewater Care Works Outside Springs, the Blesbokspruit wetland is one of Southern Africa’s largest highveld wetlands. Apart from being internationally recognised, the area also received treated effluent from the Welgedacht Wastewater Care Works. East Rand Water Care Company (ERWAT) commissioned the plant’s Module 2 expansion. Find out more 05 / 10 > < PROBLEMS WE’VE SOLVED: SANAE IV Research Base Project Story
Located 250km inland from the Antarctic ice shelf, SANAE IV has kept South African scientists safe since 1997.

But after nearly two decades of 24/7 operation, its systems were well past their prime. Power systems, water supply, waste management and heating – all critical to survival in Antarctica – were in dire straits.
Find out more 06 / 10 > <
PROBLEMS WE’VE SOLVED: Crystalactor® Water Treatment Mine water typically has a high mineral content, but this was becoming a costly operational headache at one West Rand gold mine.

Calcium and magnesium build-up caused “hard water,” which began to solidify – and clog pipes.
Find out more 07 / 10 > <
PROBLEMS WE’VE SOLVED: Maputo BRT System Congestion, unregulated traffic, and informal trade spilling into the streets created chaotic transport conditions that limited access to work, safety, and opportunity.

Many roads and vehicles were in poor condition, and safe, reliable transport remained out of reach for thousands.
Find out more 08 / 10 > <
PROBLEMS WE’VE SOLVED: George Low-Cost Housing Delivered through the Western Cape Department of Infrastructure and George Municipality, the handovers formed part of a broader effort to accelerate access to adequate housing in the area.

Atana supported both projects through project management and Clerk of Works services spanning planning, design, procurement, contract administration and construction monitoring.
Find out more 09 / 10 > <
PROBLEMS WE’VE SOLVED: Built for continuous progress Toyota’s new parts warehouse is a landmark investment in South Africa’s capability, and a key step in Toyota’s long-term strategy to strengthen local manufacturing and regional exports.

Designed and delivered by Atana as the primary engineering consultant, the project combines sustainability, speed, and technical ingenuity.

Find out more 10 / 10 > <