Brandwacht Pedestrian Bridge

Tucked along the scenic R328 between Mossel Bay and Oudtshoorn, Brandwacht is a small town on one of the Garden Route’s busiest stretches.

But with limited visibility, high-speed traffic and tragic pedestrian fatalities, residents and especially children were risking their lives to cross the road.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Engineering at 2,874m

Brandwacht Pedestrian Bridge

Tucked along the scenic R328 between Mossel Bay and Oudtshoorn, Brandwacht is a small town on one of the Garden Route’s busiest stretches.

But with limited visibility, high-speed traffic and tragic pedestrian fatalities, residents and especially children were risking their lives to cross the road.

PROJECT INFORMATION

Client:Mossel Bay Municipality
Main contractor: 
JV partnersEMPA
Date: 
Location:Brandwacht, South Africa
Challenge:High-speed traffic and poor visibility made crossing the R328 life-threatening for Brandwacht residents.
Solution:A community-informed pedestrian bridge designed for safety, visibility, and resilience
Impact:A safer daily commute for hundreds of residents and motorists

PROBLEMS WE SOLVED

Caught between beauty and danger

Brandwacht is home to just 2,000 residents who desperately needed a solution to a road that had already claimed several lives, including those of four children.

In 2018, after Mossel Bay Municipality’s successful application for Municipal Infrastructure Grant (MIG) funding, Atana was appointed to help construct a long-term solution.

Atana’s challenge? Design and supervise the construction of a pedestrian bridge that balances practicality, visual appeal and community support.

Smart design. Safer journeys.

  • Community-informed design: Location and layout were refined in consultation with local leaders and the nearby school, to ensure daily use.
  • Built for reliance: Designed with curved soffits, radiused corners, and a protective cage to protect pedestrians and withstand vehicle impact.
  • Prefabrication for safety: Formwork was assembled off-site to reduce risk and disruption during on-site construction.
  • Cage design with visibility: Wave-shaped horizontal bars painted ocean blue improve aesthetics and allow clear sightlines across the bridge.
  • Minimal traffic impact: Construction was carefully staged using speed reductions, height restrictions, and controlled windows to avoid congestion.
  • Geotechnical precision: Revised foundation designs and earth-filled ramps with gabion walls create stable access without encroaching on nearby properties.

Beyond the bridge, Atana ensured:

  • Pedestrian safety, preventing future road fatalities;
  • Local employment, training, and upskilling opportunities;
  • A sense of ownership built through deep community involvement; and
  • On-time, on-budget completion with enduring value.

A bridge built by the people it protects

The Brandwacht Pedestrian Bridge project won the CESAA Engineering Excellence Award 2022 in the “Projects Less Than R50 Million” category.

PROBLEMS WE’VE SOLVED: Sani Pass Upgrade Sani Pass (P318) is a lifeline for trade and tourism, linking South Africa and Lesotho through one of the region’s most challenging and scenic routes.



As the only road that crosses the summit of the Drakensberg Mountain range, Sani Pass’s steep switchbacks, loose gravel, and sudden weather changes meant local communities faced dangerous journeys to access schools, healthcare, and trade routes.
Find out more 01 / 10 > <
PROBLEMS WE’VE SOLVED: Altis Biologics Bone Processing Facility The future use of the campus had to be re-examined because of the growth in the number of students at Erasmus University Rotterdam (EUR), different ways of working together and the integration of new activities on campus such as startups, culture, sports and living. Find out more 02 / 10 > < PROBLEMS WE’VE SOLVED: Brandwacht Pedestrian Bridge Tucked along the scenic R328 between Mossel Bay and Oudtshoorn, Brandwacht is a small town on one of the Garden Route’s busiest stretches. Find out more 03 / 10 > < PROBLEMS WE’VE SOLVED: Mountain View Project Story
Mountain View is a high-density housing development on the outskirts of Mossel Bay. It offers over 1,000 erven for low-income families in the region. Find out more 04 / 10 > <
PROBLEMS WE’VE SOLVED: Welgedacht Wastewater Care Works Outside Springs, the Blesbokspruit wetland is one of Southern Africa’s largest highveld wetlands. Apart from being internationally recognised, the area also received treated effluent from the Welgedacht Wastewater Care Works. East Rand Water Care Company (ERWAT) commissioned the plant’s Module 2 expansion. Find out more 05 / 10 > < PROBLEMS WE’VE SOLVED: SANAE IV Research Base Project Story
Located 250km inland from the Antarctic ice shelf, SANAE IV has kept South African scientists safe since 1997.

But after nearly two decades of 24/7 operation, its systems were well past their prime. Power systems, water supply, waste management and heating – all critical to survival in Antarctica – were in dire straits.
Find out more 06 / 10 > <
PROBLEMS WE’VE SOLVED: Crystalactor® Water Treatment Mine water typically has a high mineral content, but this was becoming a costly operational headache at one West Rand gold mine.

Calcium and magnesium build-up caused “hard water,” which began to solidify – and clog pipes.
Find out more 07 / 10 > <
PROBLEMS WE’VE SOLVED: Maputo BRT System Congestion, unregulated traffic, and informal trade spilling into the streets created chaotic transport conditions that limited access to work, safety, and opportunity.

Many roads and vehicles were in poor condition, and safe, reliable transport remained out of reach for thousands.
Find out more 08 / 10 > <
PROBLEMS WE’VE SOLVED: George Low-Cost Housing Delivered through the Western Cape Department of Infrastructure and George Municipality, the handovers formed part of a broader effort to accelerate access to adequate housing in the area.

Atana supported both projects through project management and Clerk of Works services spanning planning, design, procurement, contract administration and construction monitoring.
Find out more 09 / 10 > <
PROBLEMS WE’VE SOLVED: Built for continuous progress Toyota’s new parts warehouse is a landmark investment in South Africa’s capability, and a key step in Toyota’s long-term strategy to strengthen local manufacturing and regional exports.

Designed and delivered by Atana as the primary engineering consultant, the project combines sustainability, speed, and technical ingenuity.

Find out more 10 / 10 > <