Crystalactor® Water Treatment Project Story

Mine water typically has a high mineral content, but this was becoming a costly operational headache at one West Rand gold mine.

Calcium and magnesium build-up caused “hard water,” which began to solidify – and clog pipes.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Zero waste, maximum value

Crystalactor® Water Treatment Project Story

Mine water typically has a high mineral content, but this was becoming a costly operational headache at one West Rand gold mine.

Calcium and magnesium build-up caused “hard water,” which began to solidify – and clog pipes.

PROJECT INFORMATION

Client:Gold mine in the West Rand
Main contractor:Local South African OEM supported by Atana
JV partners: 
Date: 
Location:Gauteng, South Africa
Challenge: 
Solution:Atana’s Crystalactor® system treats 5 Ml/day, converting dissolved minerals into valuable pellets with no hazardous byproducts.
Application:Mine water softening
Impact:Reduced waste, improved operations, and a self-sustaining system that delivers long-term value

Hard water. Hard costs.

The mine’s existing system couldn’t effectively remove these excess minerals and solid deposits impacted water treatment and site operations.

Worse still, the removal process generated sludge with no resale value – just added cost and compliance issues.

Atana’s challenge? Find a solution that eliminates hard water’s effects, avoids waste, and delivers long-term economic benefits.

A circular approach to clean water

  • Crystalactor® technology: This zero-waste system crystallises target minerals onto a seed material inside a fluidised bed reactor.
  • Pellet formation: Instead of sludge, the process forms high-purity pellets that can be recovered, reused, or sold – creating a circular value chain.
  • No hazardous waste: The system eliminates sludge disposal costs and environmental risks.
  • High-volume performance: Crystalactor® is designed to treat 5 Ml (5 mega litres) of mineral-rich water daily.
  • Ongoing impact: The mine’s team reports reliable performance and consistent results years after installation.

Beyond treatment, Atana enabled:

  • A zero-waste alternative to conventional sludge-based solid liquid separation;
  • An additional revenue stream through pellet recovery;
  • Lower operational risk from blocked pipes and system strain; and
  • A more sustainable, cost-effective water treatment process.

Waste turned into worth

By replacing sludge with saleable pellets, Crystalactor® technology not only cleans the mine’s water but also turns a compliance issue into a commercial opportunity.

PROBLEMS WE’VE SOLVED: Sani Pass Upgrade Sani Pass (P318) is a lifeline for trade and tourism, linking South Africa and Lesotho through one of the region’s most challenging and scenic routes.



As the only road that crosses the summit of the Drakensberg Mountain range, Sani Pass’s steep switchbacks, loose gravel, and sudden weather changes meant local communities faced dangerous journeys to access schools, healthcare, and trade routes.
Find out more 01 / 10 > <
PROBLEMS WE’VE SOLVED: Altis Biologics Bone Processing Facility The future use of the campus had to be re-examined because of the growth in the number of students at Erasmus University Rotterdam (EUR), different ways of working together and the integration of new activities on campus such as startups, culture, sports and living. Find out more 02 / 10 > < PROBLEMS WE’VE SOLVED: Brandwacht Pedestrian Bridge Tucked along the scenic R328 between Mossel Bay and Oudtshoorn, Brandwacht is a small town on one of the Garden Route’s busiest stretches. Find out more 03 / 10 > < PROBLEMS WE’VE SOLVED: Mountain View Project Story
Mountain View is a high-density housing development on the outskirts of Mossel Bay. It offers over 1,000 erven for low-income families in the region. Find out more 04 / 10 > <
PROBLEMS WE’VE SOLVED: Welgedacht Wastewater Care Works Outside Springs, the Blesbokspruit wetland is one of Southern Africa’s largest highveld wetlands. Apart from being internationally recognised, the area also received treated effluent from the Welgedacht Wastewater Care Works. East Rand Water Care Company (ERWAT) commissioned the plant’s Module 2 expansion. Find out more 05 / 10 > < PROBLEMS WE’VE SOLVED: SANAE IV Research Base Project Story
Located 250km inland from the Antarctic ice shelf, SANAE IV has kept South African scientists safe since 1997.

But after nearly two decades of 24/7 operation, its systems were well past their prime. Power systems, water supply, waste management and heating – all critical to survival in Antarctica – were in dire straits.
Find out more 06 / 10 > <
PROBLEMS WE’VE SOLVED: Crystalactor® Water Treatment Mine water typically has a high mineral content, but this was becoming a costly operational headache at one West Rand gold mine.

Calcium and magnesium build-up caused “hard water,” which began to solidify – and clog pipes.
Find out more 07 / 10 > <
PROBLEMS WE’VE SOLVED: Maputo BRT System Congestion, unregulated traffic, and informal trade spilling into the streets created chaotic transport conditions that limited access to work, safety, and opportunity.

Many roads and vehicles were in poor condition, and safe, reliable transport remained out of reach for thousands.
Find out more 08 / 10 > <
PROBLEMS WE’VE SOLVED: George Low-Cost Housing Delivered through the Western Cape Department of Infrastructure and George Municipality, the handovers formed part of a broader effort to accelerate access to adequate housing in the area.

Atana supported both projects through project management and Clerk of Works services spanning planning, design, procurement, contract administration and construction monitoring.
Find out more 09 / 10 > <
PROBLEMS WE’VE SOLVED: Built for continuous progress Toyota’s new parts warehouse is a landmark investment in South Africa’s capability, and a key step in Toyota’s long-term strategy to strengthen local manufacturing and regional exports.

Designed and delivered by Atana as the primary engineering consultant, the project combines sustainability, speed, and technical ingenuity.

Find out more 10 / 10 > <