Skip to content
Engineering at 2,874m

Mountain View Project Story

Mountain View is a high-density housing development on the outskirts of Mossel Bay. It offers over 1,000 erven for low-income families in the region.

But, like many large-scale developments of its kind, the area faced several risks, including vandalism, fragmented communities, and the long-term strain of poor water infrastructure.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Engineering at 2,874m

Mountain View Project Story

Mountain View is a high-density housing development on the outskirts of Mossel Bay. It offers over 1,000 erven for low-income families in the region.

But, like many large-scale developments of its kind, the area faced several risks, including vandalism, fragmented communities, and the long-term strain of poor water infrastructure.

PROJECT INFORMATION

Client:Western Cape Government
Main contractor: 
JV partners 
Date: 
Location:Mountain View, Mossel Bay, South Africa
Challenge:Delivering resilient, affordable housing in a high-density area with limited water control, inadequate stormwater infrastructure, and signs of community tension
Solution:A water-sensitive, community-conscious development supported by practical design, shared spaces, and resilient infrastructure
Impact:Zero post-occupancy vandalism, improved water management, and a safer, stronger sense of community belonging

PROBLEMS WE SOLVED

More than bricks and mortar

When the neighbourhood showed signs of neglect, social consequences soon followed. This, coupled with climatic extremes, led to health risks, resource conflicts, and a breakdown in community cohesion.

That’s when the Western Cape Government approached Atana to deliver the infrastructure and systems to support long-term liveability and restore dignity to the houses’ beneficiaries.

Atana’s challenge? Servicing 1003 residential and 9 non-residential plots, resolving systemic water infrastructure, including drought and flood risk mitigation, and addressing the social strain that comes with it. 

Shaping shared ground

  • Rainwater harvesting: Roof runoff is collected via house gutters into 5,000-litre storage tanks, providing non-potable water for irrigation and household use and reducing pressure on municipal supply.
  • Water-efficient fixtures: Low-flow plumbing across the development minimises daily water consumption and promotes long-term conservation.
  • Stormwater management: A hybrid green-grey system with vegetated detention ponds captures and filters runoff, reducing drainage load and mitigating flood risk.
  • Community infrastructure: Children’s play areas, sports fields, and recreational zones help to foster community connection.
  • Future initiatives: Plans to develop a school and urban agricultural area give the community an ongoing sense of support.

Uniting a community of strangers

Project teams launched a mural painting initiative to help build connections, create visibility, and foster shared ownership of the area. Khoi San Traditional Leaders led a ceremonial blessing to welcome the new residents, facilitate storytelling, and host creative sessions during the final mural phase.

Beyond construction, Atana delivered:

  • A community-driven sense of belonging and respect for shared infrastructure, supported by the mural initiative;
  • An inclusive, layered design process that bridged climatic, technical, and social risks; and
  • A self-sustaining, water-sensitive development where infrastructure works and people stay connected.

Connecting more than pipes

A paper written about the Mountain View project was awarded “Best Paper” at the 2024 IMESA Conference.

PROBLEMS WE’VE SOLVED: Sani Pass Upgrade Sani Pass (P318) is a lifeline for trade and tourism, linking South Africa and Lesotho through one of the region’s most challenging and scenic routes.



As the only road that crosses the summit of the Drakensberg Mountain range, Sani Pass’s steep switchbacks, loose gravel, and sudden weather changes meant local communities faced dangerous journeys to access schools, healthcare, and trade routes.
Find out more 01 / 10 > <
PROBLEMS WE’VE SOLVED: Altis Biologics Bone Processing Facility The future use of the campus had to be re-examined because of the growth in the number of students at Erasmus University Rotterdam (EUR), different ways of working together and the integration of new activities on campus such as startups, culture, sports and living. Find out more 02 / 10 > < PROBLEMS WE’VE SOLVED: Brandwacht Pedestrian Bridge Tucked along the scenic R328 between Mossel Bay and Oudtshoorn, Brandwacht is a small town on one of the Garden Route’s busiest stretches. Find out more 03 / 10 > < PROBLEMS WE’VE SOLVED: Mountain View Project Story
Mountain View is a high-density housing development on the outskirts of Mossel Bay. It offers over 1,000 erven for low-income families in the region. Find out more 04 / 10 > <
PROBLEMS WE’VE SOLVED: Welgedacht Wastewater Care Works Outside Springs, the Blesbokspruit wetland is one of Southern Africa’s largest highveld wetlands. Apart from being internationally recognised, the area also received treated effluent from the Welgedacht Wastewater Care Works. East Rand Water Care Company (ERWAT) commissioned the plant’s Module 2 expansion. Find out more 05 / 10 > < PROBLEMS WE’VE SOLVED: SANAE IV Research Base Project Story
Located 250km inland from the Antarctic ice shelf, SANAE IV has kept South African scientists safe since 1997.

But after nearly two decades of 24/7 operation, its systems were well past their prime. Power systems, water supply, waste management and heating – all critical to survival in Antarctica – were in dire straits.
Find out more 06 / 10 > <
PROBLEMS WE’VE SOLVED: Crystalactor® Water Treatment Mine water typically has a high mineral content, but this was becoming a costly operational headache at one West Rand gold mine.

Calcium and magnesium build-up caused “hard water,” which began to solidify – and clog pipes.
Find out more 07 / 10 > <
PROBLEMS WE’VE SOLVED: Maputo BRT System Congestion, unregulated traffic, and informal trade spilling into the streets created chaotic transport conditions that limited access to work, safety, and opportunity.

Many roads and vehicles were in poor condition, and safe, reliable transport remained out of reach for thousands.
Find out more 08 / 10 > <
PROBLEMS WE’VE SOLVED: George Low-Cost Housing Delivered through the Western Cape Department of Infrastructure and George Municipality, the handovers formed part of a broader effort to accelerate access to adequate housing in the area.

Atana supported both projects through project management and Clerk of Works services spanning planning, design, procurement, contract administration and construction monitoring.
Find out more 09 / 10 > <
PROBLEMS WE’VE SOLVED: Built for continuous progress Toyota’s new parts warehouse is a landmark investment in South Africa’s capability, and a key step in Toyota’s long-term strategy to strengthen local manufacturing and regional exports.

Designed and delivered by Atana as the primary engineering consultant, the project combines sustainability, speed, and technical ingenuity.

Find out more 10 / 10 > <