PROJECT INFORMATION
| Client: | Western Cape Government |
| Main contractor: | |
| JV partners | |
| Date: | |
| Location: | Mountain View, Mossel Bay, South Africa |
| Challenge: | Delivering resilient, affordable housing in a high-density area with limited water control, inadequate stormwater infrastructure, and signs of community tension |
| Solution: | A water-sensitive, community-conscious development supported by practical design, shared spaces, and resilient infrastructure |
| Impact: | Zero post-occupancy vandalism, improved water management, and a safer, stronger sense of community belonging |
PROBLEMS WE SOLVED
More than bricks and mortar
When the neighbourhood showed signs of neglect, social consequences soon followed. This, coupled with climatic extremes, led to health risks, resource conflicts, and a breakdown in community cohesion.
That’s when the Western Cape Government approached Atana to deliver the infrastructure and systems to support long-term liveability and restore dignity to the houses’ beneficiaries.
Atana’s challenge? Servicing 1003 residential and 9 non-residential plots, resolving systemic water infrastructure, including drought and flood risk mitigation, and addressing the social strain that comes with it.


Shaping shared ground
- Rainwater harvesting: Roof runoff is collected via house gutters into 5,000-litre storage tanks, providing non-potable water for irrigation and household use and reducing pressure on municipal supply.
- Water-efficient fixtures: Low-flow plumbing across the development minimises daily water consumption and promotes long-term conservation.
- Stormwater management: A hybrid green-grey system with vegetated detention ponds captures and filters runoff, reducing drainage load and mitigating flood risk.
- Community infrastructure: Children’s play areas, sports fields, and recreational zones help to foster community connection.
- Future initiatives: Plans to develop a school and urban agricultural area give the community an ongoing sense of support.
Uniting a community of strangers
Project teams launched a mural painting initiative to help build connections, create visibility, and foster shared ownership of the area. Khoi San Traditional Leaders led a ceremonial blessing to welcome the new residents, facilitate storytelling, and host creative sessions during the final mural phase.


Beyond construction, Atana delivered:
- A community-driven sense of belonging and respect for shared infrastructure, supported by the mural initiative;
- An inclusive, layered design process that bridged climatic, technical, and social risks; and
- A self-sustaining, water-sensitive development where infrastructure works and people stay connected.
Connecting more than pipes
A paper written about the Mountain View project was awarded “Best Paper” at the 2024 IMESA Conference.
As the only road that crosses the summit of the Drakensberg Mountain range, Sani Pass’s steep switchbacks, loose gravel, and sudden weather changes meant local communities faced dangerous journeys to access schools, healthcare, and trade routes.
But after nearly two decades of 24/7 operation, its systems were well past their prime. Power systems, water supply, waste management and heating – all critical to survival in Antarctica – were in dire straits.
Calcium and magnesium build-up caused “hard water,” which began to solidify – and clog pipes.
Many roads and vehicles were in poor condition, and safe, reliable transport remained out of reach for thousands.
Atana supported both projects through project management and Clerk of Works services spanning planning, design, procurement, contract administration and construction monitoring.
Designed and delivered by Atana as the primary engineering consultant, the project combines sustainability, speed, and technical ingenuity.

