Engineering at 2,874m

Welgedacht Wastewater Care Works

Outside Springs, the Blesbokspruit wetland is one of Southern Africa’s largest highveld wetlands.

Apart from being internationally recognised, the area also received treated effluent from the Welgedacht Wastewater Care Works. East Rand Water Care Company (ERWAT) commissioned the plant’s Module 2 expansion.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Engineering at 2,874m

Welgedacht Wastewater Care Works

Outside Springs, the Blesbokspruit wetland is one of Southern Africa’s largest highveld wetlands.

Apart from being internationally recognised, the area also received treated effluent from the Welgedacht Wastewater Care Works. East Rand Water Care Company (ERWAT) commissioned the plant’s Module 2 expansion.

PROJECT INFORMATION

Client:East Rand Water Care Company (ERWAT)
Main contractor:Protech Khuthele (Pty) Ltd, Group Five Civil Engineering (Pty) Ltd, WEC Projects (Pty) Ltd
JV partnersAtana, Palace Technologies
Date:2020 – 2024
Location:Springs, South Africa
Challenge:Boosting capacity without harming the Blesbokspruit wetland or compromising operations
Solution:A dual-train 50 Ml/day upgrade, improved flow design, structural reinforcement, and advanced treatment systems
Impact:A future-ready facility that meets stringent discharge standards, supports long-term reliability, and protects wetland ecosystems

PROBLEMS WE SOLVED

Balancing capacity with conservation

The upgrade needed to significantly boost capacity without compromising the wetland’s ecological integrity. This meant adding a 50 megalitres per day (Ml/day) module and extending the inlet and outlet works for future flows, bringing the total added capacity to 100 Ml/day.

Atana’s challenge? To manage the project from planning to execution, with compliance, system resilience, and ecological protection guiding each phase.

Form, function and future thinking

  • Process trains: Two 25 Ml/day process trains can now run in parallel, allowing easy re-routing during maintenance.
  • Advanced process design: The main facility has a two-stage pump station, a head of works for screening and grit removal, two flow balancing tanks, and two primary settling tanks. Two aerated reactors and four clarifiers handle secondary treatment, while tertiary treatment includes sand filters, chlorination tanks, and de-chlorination channels.
  • Tertiary phosphorus polishing: An added treatment step ensures the final effluent meets discharge standards before release into the Blesbokspruit wetland.
  • Improved site integrity: Soil mattresses and stone columns mitigate dolomitic sinkholes and water-logged ground.
  • Collaborative compliance: Working closely with national departments, and after evaluating eleven alternatives, we selected a solution that met strict discharge regulations and standards.
  • Executed under three specialised contracts:
    1. Bulk Earthworks: Protech Khuthele (Pty) Ltd
    2. Civils and Buildings: Group Five Civil Engineering (Pty) Ltd
    3. Mechanical, Electrical, and Instrumentation: WEC Projects (Pty) Ltd

Beyond construction, Atana ensured:

  • Rigorous environmental protection at every phase;
  • Improved operational agility through smarter flow routing and modular design;
  • Seamless integration with existing facilities for streamlined performance; and
  • On-time, on-budget delivery aligned with community and ecological priorities.

Treatment that goes the extra mile

Welgedacht Wastewater Care Works Module 2 isn’t only about boosting capacity but also about setting a standard for how large-scale treatment plants can evolve without ecological disruption.

As a result, the project came in second place in two prestigious categories from the South African Institution of Civil Engineering (SAICE):

  1. Most Outstanding Project in Water Engineering
  2. Most Outstanding Civil Engineering Achievement for Technical Excellence

PROBLEMS WE’VE SOLVED: Sani Pass Upgrade Sani Pass (P318) is a lifeline for trade and tourism, linking South Africa and Lesotho through one of the region’s most challenging and scenic routes.



As the only road that crosses the summit of the Drakensberg Mountain range, Sani Pass’s steep switchbacks, loose gravel, and sudden weather changes meant local communities faced dangerous journeys to access schools, healthcare, and trade routes.
Find out more 01 / 10 > <
PROBLEMS WE’VE SOLVED: Altis Biologics Bone Processing Facility The future use of the campus had to be re-examined because of the growth in the number of students at Erasmus University Rotterdam (EUR), different ways of working together and the integration of new activities on campus such as startups, culture, sports and living. Find out more 02 / 10 > < PROBLEMS WE’VE SOLVED: Brandwacht Pedestrian Bridge Tucked along the scenic R328 between Mossel Bay and Oudtshoorn, Brandwacht is a small town on one of the Garden Route’s busiest stretches. Find out more 03 / 10 > < PROBLEMS WE’VE SOLVED: Mountain View Project Story
Mountain View is a high-density housing development on the outskirts of Mossel Bay. It offers over 1,000 erven for low-income families in the region. Find out more 04 / 10 > <
PROBLEMS WE’VE SOLVED: Welgedacht Wastewater Care Works Outside Springs, the Blesbokspruit wetland is one of Southern Africa’s largest highveld wetlands. Apart from being internationally recognised, the area also received treated effluent from the Welgedacht Wastewater Care Works. East Rand Water Care Company (ERWAT) commissioned the plant’s Module 2 expansion. Find out more 05 / 10 > < PROBLEMS WE’VE SOLVED: SANAE IV Research Base Project Story
Located 250km inland from the Antarctic ice shelf, SANAE IV has kept South African scientists safe since 1997.

But after nearly two decades of 24/7 operation, its systems were well past their prime. Power systems, water supply, waste management and heating – all critical to survival in Antarctica – were in dire straits.
Find out more 06 / 10 > <
PROBLEMS WE’VE SOLVED: Crystalactor® Water Treatment Mine water typically has a high mineral content, but this was becoming a costly operational headache at one West Rand gold mine.

Calcium and magnesium build-up caused “hard water,” which began to solidify – and clog pipes.
Find out more 07 / 10 > <
PROBLEMS WE’VE SOLVED: Maputo BRT System Congestion, unregulated traffic, and informal trade spilling into the streets created chaotic transport conditions that limited access to work, safety, and opportunity.

Many roads and vehicles were in poor condition, and safe, reliable transport remained out of reach for thousands.
Find out more 08 / 10 > <
PROBLEMS WE’VE SOLVED: George Low-Cost Housing Delivered through the Western Cape Department of Infrastructure and George Municipality, the handovers formed part of a broader effort to accelerate access to adequate housing in the area.

Atana supported both projects through project management and Clerk of Works services spanning planning, design, procurement, contract administration and construction monitoring.
Find out more 09 / 10 > <
PROBLEMS WE’VE SOLVED: Built for continuous progress Toyota’s new parts warehouse is a landmark investment in South Africa’s capability, and a key step in Toyota’s long-term strategy to strengthen local manufacturing and regional exports.

Designed and delivered by Atana as the primary engineering consultant, the project combines sustainability, speed, and technical ingenuity.

Find out more 10 / 10 > <