This June, I’m joining a panel at the Pan African DataCentres (PADC) Exhibition & Conference on how data centre design is changing to meet individual countries’ needs. The topic gets a lot of airtime, and rightly so – cooling, power, procurement, and permits shift dramatically from one country to another, especially in Africa.
But in my experience, the most consequential country-specific decisions happen well before any of that, and they’re usually where projects either find their footing or start drifting toward expensive failure
Decision 1: What is this facility actually for, in this country, right now?
I’ve said it before, and I’ll say it again: there is no such thing as future-proofing a data centre (unless, of course, you have a crystal ball). AI has reshaped the industry in two years. Anyone claiming they can engineer today for what the market will need in fifteen years is overpromising.
What we’ve seen on recent hyperscaler projects is just the opposite tendency – requests for full flexibility on everything. That sounds prudent, but it drives the price up sharply. Africa is already working hard to make standard facilities commercially viable, let alone facilities engineered for every possible future.
We recently did a technical due diligence for a client buying an existing facility in Johannesburg. The building is about three years old, has a hyperscaler signed for the next ten to twelve years, and has roughly fifteen years of useful life left.
The client’s question was obvious: how do we know this asset will still be relevant in 10 years? How do we avoid a white elephant?
My honest answer was that you can’t know. You can make educated guesses – higher-density racks, buildings sized for expansion, slabs that can take heavier loads – but you can’t engineer certainty.
What you can be reasonably certain of is that cloud demand isn’t going anywhere. That’s the foundation we can actually design for. We’re not in the global LLM training arms race. That’s a US-China dynamic. Africa will continue building cloud infrastructure for years to come, and inference workloads are already arriving. What we’re not doing, despite the hype, is hosting the training runs.
There’s a structural reason for this, too. Africa has 54 countries. The capex required to compete globally on LLM training is enormous, and no single African market – or even a coalition of markets – is currently positioned to put it up. The realistic path forward is to build African LLMs for African
needs, ideally on existing open-source platforms, which would slash development costs. That’s a continent-wide effort, not a country-by-country one.
So the first question people often skip: what is this country actually going to use this facility for, today and in the next five years?
That’s an answerable question. The future-proofing one isn’t.
Decision 2: Which African country, and which part of it?
When people talk about Africanising a design, they usually mean adapting a European or American template for African conditions. That’s part of it. But there’s also a version of Africanising that happens within Africa, and it’s the one I think gets less attention than it should.
West, East, North, and South Africa are all part of the same continent. Beyond that, they share very little in terms of data centre delivery.
Here are a few current examples:
We’re working on a proposal in Limuru, just outside Nairobi, at an average of 2,240 metres above sea level. Free cooling is viable for much of the year. We’re also working in Lagos, where free cooling is essentially zero, and the cooling load is enormous. Same continent, completely different design.
Land and connectivity tell a similar story. Nairobi space is at a premium because the city is dense and connectivity drops off fast outside it, so you design compactly, sometimes multi-storey. South Africa has reliable connectivity across industrial nodes outside the metros, so you can spread out as most US designs assume. In Nigeria, land is affordable, but power and connectivity are scarce.
Again, you have three distinct design problems on a single continent.
Some of the costliest mistakes I’ve seen come from teams treating Africa as a single market. We took over a project in Nigeria where the original consultants had designed a steel building using precast components imported from the UK. Nigeria has no real steel market and no precast import economy that makes commercial sense. By the time the design reached tender, it was twice the budget. We redesigned in brick, mortar and in-situ concrete, because that’s what the local market produces.
A separate Nigerian project we worked on tells the same story from a different angle. A template design arrived from Europe, with steel and stick-build expected. We pivoted to brick and concrete and modularised what we could because, apart from the steel conundrum, the local economy lacks the depth of construction skills to deliver fast stick-build, and procurement at the required scale isn’t reliable. We Africanised the design and tailored it specifically for Nigeria.
A few smaller examples:
European designs we’ve inherited have included heat tracing on pipes to prevent freezing – a problem we don’t have here. A driver lounge sounds optional until you’re operating a facility in Nigeria, where staff arrive with drivers who wait around all day. Without that space, you have ten cars and twenty people loitering outside the gate, and security spends its day moving them on.
These call for local knowledge that no template carries.
Even cooling itself is a useful test of how easy it is to misread the continent. Cooling isn’t really about country, but a function of latitude and altitude. For example, two countries may be at similar latitudes, but one is at 1,800 metres above sea level, while the other is at sea level. Completely different cooling design.
Humidity plays a part here as well. Mombasa on Kenya’s coast is hot and humid, while Namibia is largely hot and dry. In fact, Kenya’s own interior runs much drier than its coast. Point is, the cooling response has to follow the conditions, not the borders.
Decision 3: Should it even exist in the first place?
I’m increasingly convinced this decision should come before the first two.
A hyperscaler and its AI infrastructure partner recently put their major data centre deal in Kenya on hold. There are reasons specific to that project, but the underlying question is one the whole industry needs to take seriously: are we building data centres in Africa because the business case is there, because the renewable power is there, or because other operators are?
Kenya has geothermal at scale. The temptation is to push every AI data centre conversation toward Kenya as a result. But power is an input. Demand is what makes a build financially viable. And the demand picture for AI training in Africa isn’t what it is in the US or Asia.
There’s also the sovereignty question. You shouldn’t train US LLMs in African data centres, because the data, IP and regulatory exposure all sit elsewhere. The training workloads driving global capex aren’t going to move to Lagos or Nairobi just because the renewable power is competitive. That shapes what kind of infrastructure Africa actually needs to build.
The question of whether the facility needs to exist at all is the harder one. And it’s the one I’d most like people to think about when they leave the room after PADC.
Everything downstream, like cooling, power, supply chain and procurement, gets easier once you’ve answered it.